The former Pease Air Force Base (AFB) site is located in the towns of Newington and Greenland and the city of Portsmouth. Construction of the Strategic Air Command base was completed in 1956 and, on March 31, 1991, Pease AFB officially closed.

In 1983, the Air Force initiated installation restoration program (IRP) activities, to assess and control the migration of contamination that resulted from past operations and waste disposal practices. Based largely upon information gathered by the Air Force during IRP studies, Pease AFB was listed on the National Priority List (NPL) on February 21, 1990.

A restoration advisory board (RAB), which includes representatives from local communities, EPA, and the state, was formed to facilitate communication and coordination concerning the IRP activities conducted at Pease AFB. Additional community input was acquired through Seacoast Citizens Overseeing Pease Environment (SCOPE).

DES concurred with the 11 Superfund records of decisions (RODs) signed by EPA and the Air Force. By the summer of 2000, the Air Force had implemented all remedial actions required in the ROD’s. Some of the remedial actions and progress at the former Pease AFB include;

Site 34—the Air Force completed the excavation of contaminated soils at the Jet Engine Test Cell site (Site 34) in 1993,

Site 8—The Air Force constructed a soil vapor extraction (SVE) and groundwater treatment system to extract and contain contamination at Fire Department Training Area 2 (Site 8) in 1995. A re-examination of remaining site contamination was conducted in 2007 leading to follow-on remedial actions in select locations that included an air sparge system, improved free-product removal methods and enhanced bio-remediation. The additional remedial components were installed and began operating in 2009. In 2012 a comprehensive soil and groundwater sampling investigation was conducted to evaluate remedy performance and additional optimization actions. A recommendations report will be issued in 2014. System operations and groundwater monitoring are ongoing.

Site 32—In 1995 the Air Force installed sheet-piling to the top of bedrock to form a physical barrier around the source of groundwater contamination at Building 113 (Site 32) and constructed a groundwater treatment plant to treat groundwater pumped from seven hydraulic containment extraction wells. In 2012 a supplemental remedial action plan was proposed to excavate contaminated soil and biologically treat remaining contamination. A soil and groundwater investigation is currently ongoing to refine the proposal.

Sediment Removals—All Brooks and Ditches across the base were investigated and at a number of locations sediments were excavated and disposed offsite.

Site 39—A groundwater extraction system was brought on-line in 1997. This system consisted of seven extraction wells positioned to allow containment of groundwater contamination from Sites 34 and 39 and prevent it from migrating towards the Haven water supply well. In 2001, based upon review of performance monitoring data, it was determined this remedial system was not operating properly and successfully in accordance with Section 120(h) (3) of CERCLA. Revision of the remedy through an amendment to the ROD was completed in 2003. The revised remedy includes wellhead treatment capacity to protect the Haven water supply well and optimization of source area pumping. Construction of the revised remedy started in 2004 and was completed in 2005. Remedial system and groundwater monitoring is ongoing and contamination has been significantly reduced. The Air Force is currently conducting additional investigations to better define the remaining contamination and propose follow-on actions to close-out the site.

Site 22—In 1997 an SVE/air sparging system became operational at the former Burn Area. The SVE/Air Sparge treatment system was taken off line in 2004. Comprehensive groundwater sampling in the source area was completed in 2005 and it was determined additional active soil treatment was no longer needed and monitored natural attenuation was appropriate. Groundwater monitoring is ongoing.

Site 45—An SVE system was installed at the Old Jet Engine Test Stand (Site 45) in 1997. The system has cleaned up contaminated soils to below regulatory standards. Low levels of groundwater contamination remain and are being naturally attenuated. Groundwater monitoring is ongoing.

Site 73—In 1999 the Air Force completed installation of a permeable reactive barrier (PRB) in overburden at Building 234 (Site 73) to clean up groundwater contamination associated with solvent releases. In 2012 a modified remedy was implemented which consists of in-situ bioremediation to treat the low levels of contamination that remain. Performance monitoring is ongoing.

Site 49—In 2000 an environmental site assessment conducted at a location where redevelopment activities were planned discovered chlorinated solvents in groundwater in the vicinity of former Building 22. The site is now identified as Site 49. The Air Force completed installation of a PRB in overburden and shallow bedrock in 2000 to cleanup groundwater contamination. In 2013 a modified remedy was implemented, which consists of in-situ bioremediation treatment of the remaining contamination. Performance monitoring is ongoing.

Site 10—Groundwater monitoring at Site 10 (Leaded Fuel Tank Sludge Disposal Area) in 2000 showed dramatic increases in contamination up gradient of the site. Site 10 is located on the west side of the runway and is an area where leaded fuel tank sludge was buried. Source investigation work that included geophysical investigations, geo-probe installations, test pitting and soil sampling was conducted between 2001 and 2003, however no contamination source was found. A follow-on groundwater investigation is currently being conducted.

Site 35—Groundwater pumping was terminated at Site 35 because remedial goals have been achieved.

Landfills 2, 4, 5 and 6—the Air Force excavated waste in contact with groundwater at Landfill 5 in 1995. Concurrently, solid waste from Landfills 2, 4 and 6 was excavated and consolidated into Landfill 5. In addition, quantities of petroleum-contaminated soil, excavated under the Underground Storage Tank program were placed in Landfill 5. The landfill was then covered with a multi-layered cap, which is regularly inspected and maintained. A groundwater and surface water monitoring program is ongoing.

Weapons Storage Area (WSA) -– In 2003 information was released by the Air Force that indicated waste materials containing residual radioactive contamination generated during cleaning of certain weapons systems in the 1950s and early 1960s may have been buried within the former WSA. The site is being managed under the CERCLA program and geophysical and radiological survey investigations were completed in 2003. Follow on test-pitting investigations were conducted in December of 2004 and did not locate any radiological waste materials. The Final Preliminary Assessment and Site Inspection Report (PA/SI) was completed in November 2006 and recommended no further action.

In addition to Superfund sites at Pease there are over 60 petroleum release sites and several landfill sites that are managed outside of the CERCLA program. The landfill sites have been capped and long-term groundwater monitoring is ongoing. Monitored natural attenuation (MNA) was the selected remedy for most of the petroleum release sites located on the Flightline (FLRS). At a number of FLRS sites MNA was determined to be ineffective before the 10 year MNA timeframe expired and alternate remedies such as soil removal or AS/SVE systems have been implemented. The FLRS MNA timeframe expired in 2009 and further investigations are currently proceeding to develop alternate remedies for the sites where contamination remains.

Plume 13/14, is one of the larger petroleum release sites, and a location where the initial remedial action was not effective. A revised remedial action plan (RAP) consisting of AS/SVE was proposed in 2005 to address high levels of soil contamination that remain below the water table. The Plume 13/14 remedial system is one of the largest remedial systems at the former base. Construction for the SVE/AS remedial system was completed in the spring of 2008 and start-up began in early summer. Excessive flammable vapor generation however caused the system to be shut-down. Additional investigations and system tests are ongoing.

The Bulk Fuel Storage Area (BFSA) was the location of the primary above ground storage tank farm that supplied the FLRS. Significant contamination was present in this area and a bio-vent system was installed and began operation in 1997. The system was effective at removing the mass of contamination from the unsaturated overburden and was shut down in 2004. Pilot testing and follow-on remediation methods using enhanced biological treatment were deployed to remediate persistent contamination present in the shallow bedrock. In 2012 pre-design investigations were conducted and pilot wells installed to evaluate installation of a groundwater recirculation system to speed-up bedrock bio-remediation. Pump tests were completed in 2013 and system design work will be completed in 2014.

At Pump-House 2, another large petroleum release site, the original enhanced bio-remediation remedy was not effective. An alternatives analysis was conducted in 2007 to determine the cost and feasibility of a number of remedial alternatives. An AS/SVE remedial system was selected by the Air Force. The system was constructed and started operation in 2010. Performance monitoring has indicated some system modifications will be required. These modifications are currently underway.

In addition to the clean-up activities at Pease, environmental survey and property transfer work was completed at the remaining Pease land parcels and the deeded property transfer to the Pease Development Authority (PDA) was completed in 2005. DES works closely with the PDA, Air Force and EPA to review planned development activities occurring in areas of environmental concern to ensure institutional controls and other issues associated with contaminated sites are addressed. The Air Force, EPA and DES will continue to evaluate remedy performance and other monitoring data to ensure response actions are optimized and remedial objectives are achieved in a timely and cost effective manner.

In 2012, the Air Force implemented a new performance based contract for Pease, which calls for the final closure of nearly all contaminated sites by 2021.