New Hampshire
- "Guidelines for the Preparation of Site Specific Applications"
- NH Digging Requires a Federal Permit Fact Sheet

Environmental Protection Agency
- Electronic Notice of Intent (NOI)
- How to Apply for CGP
- Notice of Intent (NOI) form
- Notice of Termination (NOT) form
- Storm Water at Construction Sites: A Guide to Federal Requirements

- Storm Water Program
Contact: Thelma Murphy, EPA, 617/918-1615
Adobe Acrobat Reader format. Download a free reader from Adobe.


