skip navigation
New Hampshire Department of Environmental Services
PUBLIC GOVERNMENT BUSINESS A to Z LIST

NH Office of Economic Stimulus

Winnicut River Dam Removal Project
Winnicut Dam Removal Feasibility Study Report

Appendices

Figures

Figures 10 and 12 are embedded in the body of the report. To view those figures read the: Feasibility Study (7.5 Mb)

  • Figure 1 - Dam Location and Drainage Delineation (298 KB)
  • Figure 2 - Selected Dams in the Great Bay Ecosystem (1.21 MB)
  • Figure 3 - Conceptual Nature-Like Fish Ramp (85.8 KB)
  • Figure 4 - Alternative B. Alaska Steeppass Fishpass (43.7 MB)
  • Figure 5 - Conceptual Rock Fish Ramp (119 KB)
  • Figure 6 - Wetland Reaches (2.56 MB)
  • Figure 7 - Drainage Delineation for Oyster and Winnicut Rivers (344 KB)
  • Figure 8 - Flow Duration Curve (55.4 KB)
  • Figure 9 - Limit of Backwater During High and Low Flows (193 KB)
  • Figure 11 - Estimated Sediment Volume (132 KB)
  • Figure 13 - Sediment Sample Locations (217 KB)
  • Figure 14 - Expected Wetland Impact (2.54 MB)
  • Figure 15 - Wetland Delineation at Dam (582 KB)

 

 

Adobe Acrobat Reader Symbol Adobe Acrobat Reader format. Download a free reader from Adobe.




NH Department of Environmental Services | 29 Hazen Drive | PO Box 95 | Concord, NH 03302-0095
(603) 271-3503 | TDD Access: Relay NH 1-800-735-2964 | Hours: M-F, 8am-4pm

copyright 2014. State of New Hampshire