skip navigation
New Hampshire Department of Environmental Services
PUBLIC GOVERNMENT BUSINESS A to Z LIST

Souhegan River
Souhegan Protected Instream Flows Established (4/1/08)

Commissioner’s Declaration Adobe Acrobat Reader Symbol– Souhegan Protected Flows Established (April 1, 2008)

The Souhegan Protected Instream Flow study report (February 26, 2008) describes the scientific methods and results of the study to define protected flows on the Souhegan Designated River. On April 1, 2008, Commissioner Burack established the protected flows as water quality standards for the Souhegan Designated River. All future permits will need to comply with the established flows. A Water Management Plan is being developed for the Souhegan watershed to maintain these flows.

Table 1 - Souhegan Protected Instream Flows Adobe Acrobat Reader Symbol
Table 1 Attachment - Definitions Adobe Acrobat Reader Symbol

Souhegan PISF Report - February 26, 2008 - Final

 

 

Adobe Acrobat Reader Symbol Adobe Acrobat Reader format. Download a free reader from Adobe.




NH Department of Environmental Services | 29 Hazen Drive | PO Box 95 | Concord, NH 03302-0095
(603) 271-3503 | TDD Access: Relay NH 1-800-735-2964 | Hours: M-F, 8am-4pm

copyright 2014. State of New Hampshire