Protected Instream Flow Study
Task 5 - Instream Flow Assessments
- How to comment on the Proposed Souhegan PISF (April 20, 2007 deadline)
- Souhegan Proposed PISF – February 5, 2007
- Title - Executive Summary

- Glossary and Table of Contents

- Main Report

- References

- Appendices
- Appendix 1

- Appendix 2

- Appendix 3

- Appendix 4

- Appendix 5

- Appendix 6

- Appendix 7

- Appendix 8

- Appendix 9

- Appendix 10-HMU Maps

- Appendix 11a-Adult Suitability Maps

- Appendix 11b- Spawning Suitability Maps

- Appendix 12-Rating Curves

- Appendix 13

- Appendix 14-Verification of Model Transferability

- Appendix 15-Site 11

- Appendix 16-Transects and Photos

- Appendix 17-Example Calculations

- Appendix 1
- Title - Executive Summary
- Hydrology and the Ability of the Existing System to Meet the PISF

- IPUOCRs Evaluated by Normandeau Associates

- Souhegan River Protected Instream Flow Study

- 20051104 Final Draft - Souhegan Target Fish Community

- CUT Curve Assessment Method

Adobe Acrobat Reader format. Download a free reader from Adobe.


