skip navigation
New Hampshire Department of Environmental Services
PUBLIC GOVERNMENT BUSINESS A to Z LIST

Status of Projects Currently Under Review

Projects Requiring Individual 401 Certification for Federal Licenses or Permits (other than FERC)

Projects Currently Under Review or Recently Issued

File No. WQC#2012-404I-002
Applicant: US Army Corps of Engineers/State of New Hampshire
Project Description: Hampton Harbor Dredging
Project Location: Hampton Harbor
Application Status: Approved
Relevant Documents: 401 Certification Adobe Acrobat Reader Symbol
Response to Comments Adobe Acrobat Reader Symbol
File No. 2012-404P-002
Applicant: US Army Corps of Engineers
Project Description: 401 Water Quality Certification for Programmatic General Permit
Project Location: Statewide
Application Status:

Approved

Relevant Documents: Final 401 WQC 2012-404P-002 Adobe Acrobat Reader Symbol
File No. 2012-USCG-001
Applicant: State of New Hampshire Department of Transportation
Project Description: Portsmouth Kittery Memorial Bridge Replacement Project
Project Location: Portsmouth, NH/Kittery, Maine
Application Status:

Approved

Relevant Documents: Final Water Quality Certification issued April 16, 2012 Adobe Acrobat Reader Symbol
File No. 2009-002
Applicant: Nashua Municipal Airport – Boire Field Project
Project Description: Reconstruction of Runway 14-32 and associated taxiway
Project Location: Nashua, New Hampshire
Application Status:

Approved. Final Water Quality Certification issued 2/1/11

Relevant Documents: Final WQC 2009-002 Adobe Acrobat Reader Symbol
File No. 2007-005
Applicant: RMR Pacific, LLC
Project Description: Construct and operate Ragged Mountain Phase I development
Project Location: Merrimack County in the Town of Danbury
Application Status: Approved. Final Water Quality Certification issued 11/4/09
Relevant Documents: Final WQC 2007-005 Adobe Acrobat Reader Symbol
Response to Comments WQC 2007-005 Adobe Acrobat Reader Symbol
File No. 2006-011.1
Applicant: Waterstone Retail Epping, LLC
Project Description: Construction and operation of Brickyard Square of Epping, which consists of five separate (unattached) buildings that include retail stores, a restaurant and a hotel and associated access ways, parking and utilities.
Project Location: Epping, NH
Application Status:

Approved. December 21, 2010.

Relevant Documents: Final Modified 401 WQC 2006-011.1 Adobe Acrobat Reader Symbol
File No. 2006-013
Applicant: New Hampshire Department of Transportation
Project Description: Reconstruct and widen portions of the Spaulding Turnpike Newington – Dover, 11238, NHS-027-1(37)
Project Location: Dover (Strafford County) and Newington (Rockingham County)
Application Status: Approved. Final Water Quality Certification issued 2/3/10
Relevant Documents: Final WQC 2006-013 Adobe Acrobat Reader Symbol
Response to Comments WQC 2006-013 Adobe Acrobat Reader Symbol

 

 

Adobe Acrobat Reader Symbol Adobe Acrobat Reader format. Download a free reader from Adobe.




NH Department of Environmental Services | 29 Hazen Drive | PO Box 95 | Concord, NH 03302-0095
(603) 271-3503 | TDD Access: Relay NH 1-800-735-2964 | Hours: M-F, 8am-4pm

copyright 2014. State of New Hampshire