skip
Home
 
 
About DES
DES Programs
Public Information
Rules/Regulatory
Business Center
OneStop Data
 
What's New?
 
A-Z Topics List
 
 

New Hampshire Department of Environmental Services

Watershed Management Bureau

  Total Maximum Daily Load (TMDL) Program

    Definition



The term "total maximum daily load" (TMDL) refers to the calculation of the maximum amount of a pollutant that a waterbody can receive, and attain or maintain water quality standards for its designated use.
Photo
The TMDL calculation allows for the determination of a carefully identified allowable pollutant load equivalent to the sum of the waste load allocations (WLA) for point sources, load allocations (LA) for nonpoint sources and naturally occurring background sources, and an allocation of that load among the pollutant's sources. The TMDL calculation is required to account for seasonal variations and it must include a margin of safety (MOS) that accounts for uncertainty and any lack of knowledge concerning the relationship between effluent limitations and water quality. Therefore the TMDL equation can be expressed as:

TMDL = WLA + LA + MOS

This amount is then allocated between all sources of that pollutant. TMDLs may be expressed in terms of either mass per time, toxicity, concentration, narrative description, or other appropriate measure that relate to a State's water quality standard. All TMDLs are subject to public review and comment and must be submitted to the United States Environmental Protection Agency (EPA) for review and approval.

In the broader sense of the term, a TMDL refers to a detailed plan that identifies the pollutant reductions a waterbody needs to meet New Hampshire's water quality standards and develops a strategy to implement those reductions is order to restore the water quality. The general process by which TMDLs are developed includes identifying the problem pollutant, establishing of the water quality goals or target values needed to achieve water quality standards, identifying of the specific sources contributing the pollutant of concern, and then assigning a specific load allocation to each of the sources. Follow-up monitoring is needed to ensure that the implemented TMDL results in the attainment of the targeted water quality standard.


TMDL...
Definition

FAQs

TMDL Project Information and Reports

NH 303(d) List

Regulations [EPA]

Draft TMDL's Out for Public Comment



What's New
Upper Merrimack and Pemigewasset River Study
 
Draft Chloride TMDL for Dinsmore Brook
 
Draft Chloride TMDL for Beaver Brook
 
EPA's Review and Approval of the Northeast Regional Mercury TMDL
 
Draft Chloride TMDL for Policy Brook

Draft Chloride TMDL for North Tributary to Canobie Lake
 
FINAL Northeast Regional Mercury TMDL Report
 
NPDES General Stormwater Permits (CGP) and Municipal Separate Storm Sewer System (MS4) Permit Application Inquiries


View PDF files with Adobe Acrobat Reader, available for free download at Adobe.com

 
State Seal NH.GovPrivacy PolicyAccessibility Policy